The two calls concerned different jobs. The first caller described water entering at a window and considered reducing the repair scope. The second caller asked how much would be opened during rainy conditions. Our answers addressed each job separately.
The first call: a leaking window and a smaller repair scope
The first caller reported water entering the house at a window when the stucco became very wet.
It's when the stucco gets really wet, then it starts leaking in behind and on into my window into the house.
On the chimney stuff and probably just do the window.
The caller considered postponing the chimney work and having only the window addressed. Our response described opening the affected area and installing paper, followed by waterproofing and plastering for the repair under discussion.
Open them up, put the paper, waterproof them, and then plaster them.
The caller also had a painting question about work along the side of the house. We were asked whether that area would need repainting afterward.
Come out or do I have to repaint it after you do that.
You have to have like a gallon of paint, and then we can just roll it.
Our response was that we could roll on paint if the caller had paint available. We explained that painting would avoid different colors. The caller also confirmed that the house was already painted.
You don't have different colors.
The second call: working in sections during rain
The caller in the separate second conversation asked whether all the wood would be removed.
No, pero pues acuérdate que va a quitar toda la madera, ¿No?
No, no, lo hago en secciones todo, cuando es tiempo de lluvia se hace todo en secciones para que no se moje.
Our response described opening sections during rainy conditions, not opening everything at once. We explained that the windows would be installed in the section being worked on before that section was covered with paper and metal. The stated purpose was to limit rain exposure.
Ya ve que tiene una ventana, se mete la ventana y se tapa con papel y metal, queda ya listo pues si hago la mitad de la casa, le meto las ventanas y la tapo de una vez para que no se moje.
The difference between these calls is the repair scope in one and the work sequence in the other. Our first response covered window work and a separate painting question. Our second response explained working in sections during rain. The answers apply to their own conversations; they do not describe one shared project.
You can discuss your window water concern, painting question or questions about how we would proceed during rain.